Reed Construction Tube cane; the tubes need to be spilt, cut to length and then gouged. Pieces of gouged cane; usually 75-76mm long and gouged to a central thickness of 0.57-0.60mm depending on experienced preference. These pieces are now ready for shaping. This is an holding page. Under construction.